Section 102 existing sewer adoption
See also: Section 102 of the Town and Country Planning Act 1990 enabling a notice to be issued ordering the discontinuing use, or alteration or removal of buildings or works.
Section 104 of the Water Industry Act 1991 provides a mechanism for newly-constructed private sewers and pumping stations to be ‘adopted’ by the local sewerage authority, who will then maintain them at their own expense.
However, sometimes sewers are not adopted when they are constructed. The most common reasons for this are that they have not been constructed to the required standards or that they are in inaccessible locations.
Section 102 of the Water Industry Act, allows the owners of existing private sewers and associated apparatus to apply for them to be ‘adopted’ by the local sewerage authority, who will then maintain them at their own expense.
Authorities may consider adopting private sewers if they are of a suitable construction, they form part of the general sewerage system for the area and they are accessible.
The applicant must first submit general information about the sewer to the authority, who will consider whether it may be appropriate for adoption. Further information is then submitted about the condition of the sewer, and it may then be necessary to carry out remedial works to bring it up to an adoptable standard, as set out in ‘Sewers for Adoption – a Design and Construction Guide for Developers’. An application fee is payable and any direct or associated costs must be met by the applicant.
There is then a statutory 2 month period for objection to the adoption, after which, the sewer may be adopted as a public sewer.
[edit] Related articles on Designing Buildings Wiki
- Drainage.
- French drain.
- Groundwater control in urban areas.
- Highway drainage.
- Planning for floods.
- Private sewer.
- Public sewer.
- Rainwater harvesting.
- Safe working in drains and sewers.
- Section 102 (the discontinuing use, or alteration or removal of buildings or works).
- Section 104.
- Septic tank.
- Sewer construction.
- Sewerage.
- Soakaway.
- Soil vent pipe.
- Sustainable urban drainage systems SUDS.
- Water engineering.
- Water transfers and interconnections.
Featured articles and news
Boiler Upgrade Scheme and certifications consultation
Summary of government consultation which closes 11 June 2025.
Deputy editor of AT, Tim Fraser, discusses the newly formed society with its current chair, Chris Halligan MCIAT.
Barratt Lo-E passivhaus standard homes planned enmasse
With an initial 728 Lo-E homes across two sites and many more planned for the future.
Government urged to uphold Warm Homes commitment
ECA and industry bodies write to Government concerning its 13.2 billion Warm Homes manifesto commitment.
Places of Worship in Britain and Ireland, 1929-1990. Book review.
The emancipation of women in art.
CIOB Construction Manager of the Year 2025
Just one of the winners at the CIOB Awards 2025.
Call for independent National Grenfell oversight mechanism
MHCLG share findings of Building Safety Inquiry in letter to Secretary of State and Minister for Building Safety.
The Architectural Technology Awards
AT Awards now open for this the sixth decade of CIAT.
50th Golden anniversary ECA Edmundson awards
Deadline for submissions Friday 30 May 2025.
The benefits of precast, off-site foundation systems
Top ten benefits of this notable innovation.
Encouraging individuals to take action saving water at home, work, and in their communities.
Takes a community to support mental health and wellbeing
The why of becoming a Mental Health Instructor explained.
Mental health awareness week 13-18 May
The theme is communities, they can provide a sense of belonging, safety, support in hard times, and a sense purpose.
Mental health support on the rise but workers still struggling
CIOB Understanding Mental Health in the Built Environment 2025 shows.
Design and construction material libraries
Material, sample, product or detail libraries a key component of any architectural design practice.
Construction Products Reform Green Paper and Consultation
Still time to respond as consultation closes on 21 May 2025.
Resilient façade systems for smog reduction in Shanghai
A technical approach using computer simulation and analysis of solar radiation, wind patterns, and ventilation.