Section 102 existing sewer adoption
See also: Section 102 of the Town and Country Planning Act 1990 enabling a notice to be issued ordering the discontinuing use, or alteration or removal of buildings or works.
Section 104 of the Water Industry Act 1991 provides a mechanism for newly-constructed private sewers and pumping stations to be ‘adopted’ by the local sewerage authority, who will then maintain them at their own expense.
However, sometimes sewers are not adopted when they are constructed. The most common reasons for this are that they have not been constructed to the required standards or that they are in inaccessible locations.
Section 102 of the Water Industry Act, allows the owners of existing private sewers and associated apparatus to apply for them to be ‘adopted’ by the local sewerage authority, who will then maintain them at their own expense.
Authorities may consider adopting private sewers if they are of a suitable construction, they form part of the general sewerage system for the area and they are accessible.
The applicant must first submit general information about the sewer to the authority, who will consider whether it may be appropriate for adoption. Further information is then submitted about the condition of the sewer, and it may then be necessary to carry out remedial works to bring it up to an adoptable standard, as set out in ‘Sewers for Adoption – a Design and Construction Guide for Developers’. An application fee is payable and any direct or associated costs must be met by the applicant.
There is then a statutory 2 month period for objection to the adoption, after which, the sewer may be adopted as a public sewer.
[edit] Related articles on Designing Buildings Wiki
- Drainage.
- French drain.
- Groundwater control in urban areas.
- Highway drainage.
- Planning for floods.
- Private sewer.
- Public sewer.
- Rainwater harvesting.
- Safe working in drains and sewers.
- Section 102 (the discontinuing use, or alteration or removal of buildings or works).
- Section 104.
- Septic tank.
- Sewer construction.
- Sewerage.
- Soakaway.
- Soil vent pipe.
- Sustainable urban drainage systems SUDS.
- Water engineering.
- Water transfers and interconnections.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Electrical contractors need to understand the practical implications.
The real barrier to getting more value from digital technology.
Your guide to The Construction Reset at UKCW Birmingham.
Accommodating the Victorian and Edwardian working woman. Book review.
Rethinking passive fire protection in design
PFP demands the same level of design rigour as structure or services.
38% of Gen Zs feel safe when a fire door is wedged open.
Stunning images from around the world
Shortlist for CIOB’s Art of Building photography competition.
Guidance for conversion of traditional pre-1919 stone buildings.
Industrial heritage in the Ruhr
A marked difference to the fate of industrial landscapes in the UK.
Communities will be able to build their own clean energy.
Why diversity and inclusion matters for SMEs
CIOB’s D&I Charter shows how practical changes can support long-term growth.
Cut electricity bills to power growth
Coalition sends joint letter to the Chancellor.